• Home
  • About
  • Gallery 1
  • Gallery 2
  • Gallery 3
  • Gallery 4
  • Gallery 5
  • Gallery 6
  • Gallery 7
  • Gallery 8
  • Gallery 9
  • Videos
  • Specials, news and misc items
  • Contact
  • Home
  • About
  • Gallery 1
  • Gallery 2
  • Gallery 3
  • Gallery 4
  • Gallery 5
  • Gallery 6
  • Gallery 7
  • Gallery 8
  • Gallery 9
  • Videos
  • Specials, news and misc items
  • Contact

BCB, LLC

Concrete Consultant


Reserve Today

Here’s more of what I’ve worked on

Shield Wall 39, part of Double Guard waterproofing warranty
Applying Shield Wall 39 to waterproofed concrete for Double Guard warranty
Waterproofed tunnel walls
Soil Cement stabilization using Vapor Lock SCS120
macrofibers used in lieu of WWM for parking lot in Owensboro, KY
MgKrete used to permanently repair corner of sidewalk
SCS process, sheepfoot following reclaimer
Fort Knox Medical Center second floor concrete pour with VL 20/20 for moisture mitigation
Fort Knox Medical Center second floor concrete pour with VL 20/20 for moisture mitigation
Fort Knox Medical Center second floor concrete pour with VL 20/20 for moisture mitigation
Fort Knox Medical Center second floor concrete pour with VL 20/20 for moisture mitigation
Fort Knox Medical Center second floor concrete pour with VL 20/20 for moisture mitigation

BCB, LLC

812-449-4327

[email protected]

www.linkedin.com/in/blair-jones-


  • Home
  • About
  • Gallery 1
  • Gallery 2
  • Gallery 3
  • Gallery 4
  • Gallery 5
  • Gallery 6
  • Gallery 7
  • Gallery 8
  • Gallery 9
  • Videos
  • Specials, news and misc items
  • Contact
/
Lightbox image